1590WBS

Hammond 1590 Metal Enclosure Aluminium 112mmx60mmx42mm silver IP65

HA1590WBS
Manufacturer Part No.
1590WBS
Schukat Part No.
HA1590WBS
Manufacturer
Enter your company's part number here. Your part number will be referenced on your receipts, such as the order confirmation, invoice or delivery note.
Enter your personal project number here to assign the item to a project. Your part project number will be referenced on your receipts, such as the order confirmation, invoice or delivery note.

4 Pcs. in stock

Planned delivery time
Ø 4 Weeks
Life Cycle Status
The life cycle indicates which market phase the item is in. We distinguish between: • Active (green) • NRND = Not Recommended for New Designs (yellow) • LTB = Last Time Buy (yellow) • EOL = End of Life (red)
Active
Available (from stock)
Replacement / Follow-up View entire series
Data Sheet
ECAD Model
Downloads

Prices

Manufacturer bundle 1 Pcs.
Manufacturer's packaging unit (Mfr. PU) means the smallest original packaging unit of the manufacturer.
Price per 1 Pcs.

Quantity and Options

(at least 1 or multiple of 1)
All prices net plus VAT. We do not deliver to private customers.

Fact Sheet

Notice
Cross-references:
Here you will find suitable Accessories for Enclosures.

Type
Metal Enclosure
Dimension: Length
112 mm
Dimension: Width
60 mm
Dimension: Height
42 mm
Colour
silver
Colour: lid/panel/handle
silver
Material
Aluminium
Finished
untreated
Protection Class IP
IP65
RoHS-Conform

Specifications

Close all

General

Manufacturer
  • Hammond
Series
  • 1590
Product group
  • G5118
Material
  • Aluminium
Finished
  • untreated
Colour
  • silver
Type
  • Metal Enclosure
Colour: lid/panel/handle
  • silver
Type of Mounting
  • Screw
Features
  • - Robust die-cast aluminium housing
    - Waterproof version without flange
    - Provides protection against dust and splash water
    - Low side-wall deflection angle

Notice

Dimensions and Weights

Dimension: Length
  • 112 mm
Dimension: Width
  • 60 mm
Dimension: Height
  • 42 mm

Safety/Certifications

Protection Class IP
  • IP65